Pertamina RFCC Refinery

Supply of BMS/PLC package for CO boiler


In the scope of the RFCC (Residual Fluid Catalytic Cracking) project of Pertamina, DVD Tecno S.r.l. designed and supplied the Safeguarding BMS/PLC and the relative supervision station for a CO boiler. DVD Tecno S.r.l. also supervised the installation, commissioning and start-up of the plant.

Contact Us

Project Details


  • Start: August 2013
  • End: November 2015
  • Place: Cilacap, Central Java, Indonesia
  • Amount: 350,000 €
  • Client: Selas Linde GmbH
  • End Client: PT. Pertamina (Persero)
  • Type: Petrochemical plants
  • Client Website

The project

The project included the entire new burner management system as well as the safety PLC.


Detail of the panel.
Detail of the panel.

The installation

Graphic page detailing the network status.
Graphic page detailing the network status.
The supplied cubicle.
The supplied cubicle.
View of the supplied cubicle.
View of the supplied cubicle.

During the construction of the plant, DVD Tecno S.r.l. supervised both the installation of the supplied materials and the commissioning of the new system.

The start-up

Once the assembly, the tests and the verifications by the competent body were completed, DVD Tecno S.r.l. supported the Client in the start-up of the CO boiler.


The project was also presented on The Jakarta Post

Read the article